Leaves

Calendar › Behind-the-Scenes Tour

Thursday, June 04, 2009
9:30 AM - 11:30 AM

Behind-the-Scenes Tour

? Meet at Tower City Rapid station. Tour will begin at Tower City Green/Blue Line Platform Track 10E directly into the Rail Shop (Transportation time 15-20 minutes to/from TC)? Tour/Presentation of Rail Shop will be conducted by Timothy O'Donnell, Manager of Rail Equipment ? The Shop tour will consist of a walk 'n' talk through each Shop section. Inspection, Defect Repair, Motors, Truck Shop, Body Shop, HRV Midlife. There will also be a (very) short description of the Heavy and Light Rail cars.? Return to Tower CityLimited to 50 attendees. Earn 1 CPD hour.? Meet at Tower City Rapid station. Tour will begin at Tower City Green/Blue Line Platform Track 10E directly into the Rail Shop (Transportation time 15-20 minutes to/from TC)? Tour/Presentation of Rail Shop will be conducted by Timothy O'Donnell, Manager of Rail Equipment ? The Shop tour will consist of a walk 'n' talk through each Shop section. Inspection, Defect Repair, Motors, Truck Shop, Body Shop, HRV Midlife. There will also be a (very) short description of the Heavy and Light Rail cars.? Return to Tower CityLimited to 50 attendees. Earn 1 CPD hour.

« back to calendar

Submit an event

The best bike trails

The best bike trails >

Find out where are the most interesting bike rides in Northeast Ohio

Ten water saving tips

Ten water saving tips >

We're at the shore of Lake Erie, but we still have good reasons to conserve

Your location can cost or save

Your location can cost or save >

See if your neighborhood is costing or saving you more than the average