Leaves

Calendar › Behind-the-Scenes Tour

Thursday, June 04, 2009
9:30 AM - 11:30 AM

Behind-the-Scenes Tour

? Meet at Tower City Rapid station. Tour will begin at Tower City Green/Blue Line Platform Track 10E directly into the Rail Shop (Transportation time 15-20 minutes to/from TC)? Tour/Presentation of Rail Shop will be conducted by Timothy O'Donnell, Manager of Rail Equipment ? The Shop tour will consist of a walk 'n' talk through each Shop section. Inspection, Defect Repair, Motors, Truck Shop, Body Shop, HRV Midlife. There will also be a (very) short description of the Heavy and Light Rail cars.? Return to Tower CityLimited to 50 attendees. Earn 1 CPD hour.? Meet at Tower City Rapid station. Tour will begin at Tower City Green/Blue Line Platform Track 10E directly into the Rail Shop (Transportation time 15-20 minutes to/from TC)? Tour/Presentation of Rail Shop will be conducted by Timothy O'Donnell, Manager of Rail Equipment ? The Shop tour will consist of a walk 'n' talk through each Shop section. Inspection, Defect Repair, Motors, Truck Shop, Body Shop, HRV Midlife. There will also be a (very) short description of the Heavy and Light Rail cars.? Return to Tower CityLimited to 50 attendees. Earn 1 CPD hour.

« back to calendar

Submit an event

The best bike trails

The best bike trails >

Find out where are the most interesting bike rides in Northeast Ohio

10 best ecological restoration

10 best ecological restoration >

Cities are healthier as a whole when nature is invited in.

Eco-friendly landscapes

Eco-friendly landscapes >

We look inside two local guides to native landscaping and their benefits.